Over the past few weeks we started construction on the gully cutting through #9 lake course. Part of the reason for this reconstruction is to fix the old grade making it possible for carts to drive through the gully safely. The other is to add much needed drainage through the entire area. The old path is also being removed that was in a landing area, this area will now be rough and fairway. We will also extend the fairway and rough to the left at the end of the first fairway. We will continue adding and moving drainage as well as irrigation over the next few months. Once sodded and native is seeded in the spring the area will be more appealing to the eye, safer for cart traffic and more playable. I will continue to post pictures and updates through out the construction.
10 inch drain pipe installation