While we have #18 and #17 isolated we are adding a new 6 inch gate valve. With this valve we will be able to isolate the irrigation pipe that runs under Lake View Dr. and Fairway Lane. The new valve will prepare us if the old 6 inch line breaks under the roads. If this pipe fails under the roads we will not have to isolate any areas on the golf course, giving us much more control of our water. Then we can fix the break in a timely fashion, with out having to worry about getting water out to the course.